Register for our Life Sciences Capital Benchmarking Webinar here

Close button
...
Europe

Project Fitzwilliam – ESB Head Office Redevelopment

Linesight provided Cost Management services for the development of ESB’s new corporate HQ – an example of next-generation sustainable design in large office buildings.

Key Contact

Des O'Broin

Des O'Broin

Director

Europe

des.obroin@linesight.com

+35387 233 0004

Contact Representative

Linesight provided Cost Management services for the development of ESB’s new corporate HQ – an example of next-generation sustainable design in large office buildings. 

Located in the middle of Dublin’s historic Georgian core, known as The Georgian Mile, the building was designed to be one of the most efficient and sustainable commercial office developments in Dublin City, while sensitively respecting and enhancing the Georgian streetscape. 

The main development consists of two interconnected office buildings – one accommodating the ESB Head Office, whilst the other was leased and sold by ESB to support the commercial business case for the development. This 45,000sq.m. development incorporates a considerable number of innovative sustainable technologies which will reduce carbon emissions and running costs, delivering a BER A3, near zero energy building. Innovations include: 

  • Heating and cooling are provided by ground and air source heat pumps resulting in zero local emissions 
  • Fresh air system providing up to 30% further fan energy systems over traditional constant pressure systems 
  • The building uses night cooling strategies to pre-cool the building in warmer weather.  
  • A ratio of solid to glazed areas to achieve an appropriate balance between natural light, heat gain and glazing heat loss 
  • Inclusion of 4.8km of ground source heating and cooling loops, 28kWp roof-mounted solar panels, and efficient energy management  
  • Balance of glazing and solid material to maximise solar gain and day light  
  • Implementation of green roofs to promote ecological diversity 
  • Rainwater harvesting and natural well water to achieve minimum 70% reduction in water usage  
  • Banks of solar photovoltaic panels to meet the buildings hot water requirements and supplement energy generation on-site 

Value added by Linesight 

  • Linesight provided full Cost Management services from initial design stage through tendering and to final handover 
  • Maximum efficiencies achieved through design workshops, detailed design budgets, collaboration with the design team, conducting value engineering exercises, procurement advice, tendering and agreements of contract sum and post contract cost control 
  • Implementation of an Adjusted Price Procedure (APP) to convert the original tender into a Fixed Price Lump Sum following design development post-contract. 
  • Implementation of a Client Request (C.R.) system to incorporate client variations into an adjusted contract sum. 
  • Facilitated early access for a separate client fit-out contract running in tandem with the main shell and core contract 
  • The building has achieved a BREEAM Excellent certificate for its comprehensive approach to sustainability   
Project Fitzwilliam 3

Data

45,000sq.m.

size

70% reduction

in water usage

4.8km

of ground source heating and cooling loops

Des O'Broin

Des O'Broin

Director

Europe

Latest Insights

29th April 2024

Exploring emerging trends in sustainable construction cost management practices

Conrad Gorny, Associate Director, and Danielle Hurley, ESG Program Lead, shed light on some of key trends shaping sustainable construction cost management practices.

Continue Reading